3 chan
show3
show 4
show1
mobil_1
vietnamese English
Product Category
Statistics
64Online
23,745,612 Visitors

Car volume increased by 22% over the same period of 2016

Vantai24h - 4/9/2017 - According to the Journal of Transportation, in the first 9 months of 2017, traffic volume on the lines managed and exploited by the Vietnam Expressway Development Corporation (VEC) was quite high with 22% over the same period. last year, equivalent to 27.4 million.

In particular, Cau Gie - Ninh Binh Expressway impressed with a growth rate of 35%, with 9.7 million. There are over 6.6 million means of transportation through the Noi Bai - Lao Cai expressway, which is 25% higher than the same period. Topped by the TP highways. Ho Chi Minh City - Long Thanh - Dau Giay with over 11 million vehicles, with an average flow of 35,000-40,000 per day.



In the first three quarters of the year, the number of vehicles subject to load control and the number of vehicles not allowed to enter the expressway increased by more than two times compared to the same period of last year, equivalent to over 2 million means and 35,000 vehicles denied service. With the largest length, Noi Bai - Lao Cai highway control 1,385,000 means of transport, the number of means of overload forced to turn up 1.86%.

In addition to not allowing overloaded vehicles to enter the highway, VEC has declined to serve 77 vehicles during the past nine months in violation of traffic regulations, including 48 in the highways. 9 cases to load, 4 cases of freight fraud and 02 cases against people on duty. 14 cases not on the TP. Ho Chi Minh City - Long Thanh - Dau Giay is due to the opposite way on the route.

In general, VEC's highways after being put into operation have contributed to changing the face of the transportation infrastructure of the country, a great motive force for socio-economic development, arouse the potential of localities along the route and adjacent areas ... Not only viewed from the economic point of view, the expressway after the open connection to the provinces, narrowing the region gap contributing to national security and defense; minimizing incidents, TNGT on national highways, provincial roads connecting to expressways ...

By tapchigiaothong.vn

[Back] icon Other News
Road transport news summary April 25, 2025 Procedures and documents required when sending goods from North to South by truck Road transport news summary April 24, 2025 Tips for packing goods when transporting from North to South to avoid damage Road transport news summary April 23, 2025 What items are suitable for North-South transportation by road? Road transport news summary April 22, 2025 Warning About Truck Rental Scams – How to Recognize and Avoid Them Road transport news summary April 21, 2025 Renting a Truck to Transport Goods to the Province – How to Choose the Right Vehicle for Long Routes
Search
Support Online
024 33 24 24 24 : 8h->17h024 33 24 24 25 : 8h->17h024 33 24 24 26 : 8h->17hPhan Văn Chín: Máy lẻ 104
Trần Quang Sơn: Máy lẻ 103
Nguyễn Thu Thủy: Máy lẻ 105
Ngọc Thắng: Máy lẻ 106

© 24 hours transport Co.ltd (vantai24h) 
     Head Office: 64A/21 Thanh Am Street, Long Bien District, Ha Noi.
     Transaction office: 416 Ngo Gia Tu Street, Long Bien District, Ha Noi.

Telephone:  024.33 24 24 24/33 24 24 25/ 33 24 24 26/ 33 24 24 27/38711245 / 38711246 - Fax 024.36521130 
Hotline: 0962 24 24 24 - 0963 24 24 24 - 0964 24 24 24 - 0961 24 24 24

Email: info@24hourstransport.vn

Transport services |  truck rental | cho thuê xe tải | cho thuê xe cẩu tự hành | cho thuê cẩu chuyên dụng | dịch vụ vận chuyển bắc nam | dịch vụ vận tải hàng hóa |

Copyright 2011 24hourstransport.vn. Thiết kế và phát triển bởi Bambu®